Construction of unique enterprise starts in Belarus.
Vladimir Semkin reports: Almost 10,000 hectares were set aside for the construction site. Innovative building materials will be released here. The joint Austrian-Belarusian company at the former Krychev meat-packing plant will be the first of its kind in Belarus.
It is planned to release the first production by the end of next year. Not much time is left, so immediately after the solemn laying of the stone dismantling of the unnecessary buildings of the former meat-packing plant was started.
The new plant is designed to produce 60 thousand cubic meters of cement-bonded particle boards per year.
(Vitaly Bondarik, Director General of Belzarubezhstroy)
New technologies are already used in construction in Belarus. But particle boards are still imported. Austrian and Belarusian businessmen have concluded an agreement to organize a joint import-substituting production.
(Siegfried Gassner, CEO of the Austrian company: "Our main company is located in Vienna. The work structure in Belarus is very similar to that in Austria. And I do not see any problem to invest in this country. And I believe in its future".)
Krichev was chosen because the cement plant located here is the future major supplier of raw material. The region is rich in timber.
(Anatoly Cherny, Deputy Chairman of the Mogilev Regional Executive Committee)
Incidentally, a similar factory is now being built in Venezuela. If the Krichev production will mostly meet the needs of the domestic market, the Venezuelan production will be exported.
Source: http://www.tvr.by/eng/economics.asp?id=75856
edwin jackson punksatony phil trump 2012 groundhog day groundhog phil pee wee herman ketamine
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.